|
 |


BELMONT WATER TREATMENT PLANT
Contracting Agent:
Quad Construction
Project Location:
Philadelphia, PA
Project Highlights:
Atlantic Subsurface Imaging performed Ground Penetrating Radar (GPR) scanning of 14 areas of the plant to locate any drilling obstruction in the concrete. Accurate locating on this job was critical due to the large amount of high-voltage equipment that, in the event someone drilled through a conduit, could down parts of the plant and potentially kill the driller.





back
to projects
|